Today, I am posting the pictures relating the progress works already underway to detail the admiral's bridge, or as most of you know as the wheel house.
The full set of window frames, awaiting the next step.
The locking bolt heads, as supplied ny Tichy Train Group.
A close up view of thebolt heads.
The first wondow frame.
The full set of window frames, ready for fitting in place.
An interior view of the bridge, showing the window frames in place.
The rear panel wall of the bridge, with the equipment in place.
A 1:72nd scale figure placed in front of the equipment panel, for comparision of scale.
This week, I shall be working on the navigational equipment, located on the front side of the bridge. not much equipment. Only the ships compass bearing stand, the steering control column with a small steering wheel and joysticks, and some other communications equipment + a small navigational chart table by the side. Hope to have them ready by the end of the week, so that I will apply the finish, and be able to continue with the ships, tower.